Case Studies

The Eau Claire Tower, Calgary, Alberta

Location: Calgary, Alberta, Canada
Developers: Oxford Properties
Architects:  B+H Architects
General Contractor: EllisDon

This 25 storey, 650,000-ft² office development includes a pedestrian bridge connecting it to the adjacent Centennial Place building. The tower is built to Class AAA, LEED Gold standards. The development also features a fitness and gym facility, separate bicycle parking complete with shower and locker facilities for cyclists commuting to work. HGC Engineering was involved in assessing and designing acoustical features for both base-building and fit out aspects of the project including the atrium, acoustical controls for adjoining fitness and conference centres, and typical HVAC noise control and sound isolation.

 

Acoustical Engineering Services Completed :

  • Building Services Noise and Vibration control (HVAC Systems, Pumps, Compactors, Generators, Elevators etc)
  • Acoustical Privacy Between Offices, Meeting Rooms,  Fitness and Conference Centres, etc.
  • Noise and Vibration Control of Common Spaces
  • Shop Drawing Review

 

 

Need Answers?

Reach out to our acoustical consultants now.

Call: 1-833-205-7300

Reach out to a Consultant